Project Overview

Port Equipment Co., Ltd. successfully completed a major project for the supply and installation of a Liebherr FCC crane for Phnom Penh Autonomous Port (PPAP).

This project represents another significant milestone for Port Equipment and demonstrates our capability to deliver specialized heavy port equipment solutions for critical port operations.

The installed Liebherr crane on the PPAP quay, next to stacked containers
The installed Liebherr crane on the PPAP quay, next to stacked containers

Liebherr FCC Crane — Delivered for PPAP

As part of the project, Port Equipment supplied a Liebherr FCC crane, working closely with the client and project stakeholders to ensure the equipment was delivered and installed according to the required technical and operational standards.

The project involved the coordination of equipment delivery, lifting and positioning, installation activities, technical support, and commissioning assistance. The successful completion required careful planning and coordination due to the crane’s substantial size, weight, and technical complexity.

Moving a crane component across the port with a reach stacker
Moving a crane component across the port with a reach stacker
The crane's hoist winch and wire rope ready for installation
The crane's hoist winch and wire rope ready for installation
Preparing a tower section for lifting
Preparing a tower section for lifting
Lifting a tower section into position
Lifting a tower section into position
The tower section set on its foundation
The tower section set on its foundation

Trusted by Phnom Penh Autonomous Port

We sincerely appreciate the trust placed in Port Equipment Co., Ltd. by Phnom Penh Autonomous Port. This confidence enabled our team to take on the challenge of supplying and supporting such a specialized piece of port equipment.

The successful completion of the project reflects our ability to coordinate complex equipment projects from supply through installation, while maintaining a strong focus on safety, quality, technical requirements, and operational readiness.

Preparing the crane's upper structure on the quay for lifting
Preparing the crane's upper structure on the quay for lifting
Rigging and checks at the slewing ring before the lift
Rigging and checks at the slewing ring before the lift
Turning the upper structure, with the operator's cabin, during the lift
Turning the upper structure, with the operator's cabin, during the lift
The crane's upper structure being lifted into an upright position on the quay
The crane's upper structure being lifted into an upright position on the quay
The upper structure raised upright, ready to be mounted
The upper structure raised upright, ready to be mounted

Our Expertise

Port Equipment provides more than equipment supply. Our team supports customers with comprehensive solutions covering:

  • Port and terminal equipment supply
  • Liebherr crane supply and project coordination
  • Heavy equipment transportation and delivery
  • Lifting, positioning, and installation support
  • Technical supervision and commissioning
  • Spare parts and after-sales support
  • Maintenance and technical assistance
  • Long-term equipment support

Our experience allows us to work effectively with port authorities, terminal operators, shipping and logistics companies, equipment manufacturers, contractors, and other project stakeholders.

A crane section with its hoist winch lifted during installation
A crane section with its hoist winch lifted during installation
Fitting-out work at the base of the crane tower
Fitting-out work at the base of the crane tower
Technicians working at the base of the crane tower
Technicians working at the base of the crane tower

Building Cambodia's Port Infrastructure

Projects such as this contribute to the continued modernization and development of Cambodia's port and logistics infrastructure. By delivering reliable and technically advanced equipment, Port Equipment aims to support customers in improving cargo-handling efficiency, operational capability, productivity, and safety.

The successful supply and installation of the Liebherr FCC crane at Phnom Penh Autonomous Port further strengthens Port Equipment's track record as a trusted provider of specialized port equipment solutions in Cambodia.

Mounting the upper structure on top of the crane tower
Mounting the upper structure on top of the crane tower
The upper structure in place on the tower
The upper structure in place on the tower
The top of the finished crane
The top of the finished crane
The completed crane on the quay
The completed crane on the quay
The new crane seen from the riverside at Phnom Penh Autonomous Port
The new crane seen from the riverside at Phnom Penh Autonomous Port
The crane lifting a container at the port
The crane lifting a container at the port
Containers hooked up for a lift
Containers hooked up for a lift
The crane moving a container over the quay
The crane moving a container over the quay

Port Equipment Co., Ltd.
Your Trusted Partner in Port Equipment & Logistics Solutions.

Need port equipment for your terminal?

Tell us about your operation and our team will recommend the right equipment, delivery and support plan.

Discuss Your Project

← All projects

Chat with us